Flooding during major storm events has long been a problem in the Broadway/Lomas Boulevard area as well as the historic Martineztown neighborhood.  This project, which has been in the design stages for a number of years, will address flooding concerns through:

  • A new, modern pump station
  • A new, larger stormwater detention pond

There will also be neighborhood improvements including:

  • New sidewalks and ADA ramps
  • New water and sanitary sewer lines
  • Attractive perimeter walls around the pump station to add to the neighborhood’s history and character

Construction on this $17 million project is expected to begin in October 2020 and last about 15 months, with completion scheduled in late 2021.

Site Aerial Rendering

Yes! I want to receive construction updates on the Marble-Arno Stormwater Pump Station and Detention Pond Project!

*All fields are required.

Yes! I want to receive construction updates on the Marble-Arno Stormwater Pump Station and Detention Pond Project!

*All fields are required.

fbt architects
smith engineering logo
AUI logo
groundworks logo
bridgers and paxton logo
Darcor logo
TerraCon logo

Project No. 5958.92